Projects

Tan Cang - Lach Huyen Terminal

Modified
7/13/2012

Location Hai Phong City, nearby the Northern focal economic areas including Hanoi, Quang Ninh, Hung Yen, Vinh Phuc, Bac Ninh.

International Gateway Port of Hai Phong has total 3500 ha, annual throughput capacity as 300 million ton per year, and ablility to receive container vessel with a capacity of 4000 – 6000 teus, general vessel or specialized vessels with 50.000 – 80.000 DWT.

A  Project overview

I.                    Implemetation Time of Project

From 2008 - 2020

II.                 Planning of Project

Construction of project will be divided into 2 phases:

1.    Phase 1:

  • Construction time: 2010 – 2015
  • Total investment: 7.579.374.000.000 VND

 

Include 2 sub-projects

-            Sub-project 1: Total investment: 4.660.225.000.000 VND; public works; narrow passage of river and the protection works of narrow passage of river.

-            Sub-project 2: Total investment 2.919.000.000 VND; including 02 berths with total 600m berth length to receive vessel with a capacity of 50.000 DWT.

2.    Phase 2

·        Construction time: until 2020

·        Total investment: 14.287.323.000.000 VND

Construction

-         Total berth length: 2700 m as 11 berths, ability to receive vessel with a capacity of 50.000 DWT.

-         Narrow passage of river and the protection works of narrow passage of river.

2.      Project objective: the construction of the international gateway port, trading hub, that meet the needs of export and import of goods by large tonnage vessels, for social-economic development of the Southern Provinces, and to ensure security and defense.

3.      Source of funding: the state budget, loans from foreign development aid (ODA), investment in the form of joint ventures, build-operate-transfer (BOT) ... and other funding sources.

 

B The construction’ project of Hai Phong International Gateway Port of Saigon Newport Corporation:

I.                   Scale of investment is expected to participate in the construction:

-         A large – scale plan: 09 berth – Total berth length around 2.100m

-         Total area: 200 ha

II.                The purpose of project

-         Gateway port, logistics service, free trade zone

 




Web links